Installing N+1 supplies at Southmead Hospital.

Installation and Maintenance | Healthcare

Electrio won a competitive tender to install N+1 supplies for a new theatre block at Southmead Hospital

Divider image

Prince Philip Hospital Day Surgery Unit

Design and Specification | Healthcare

Electrio was selected by Vanguard Medical to help develop a sophisticated day surgery unit at the Prince Philip Hospital in Llanelli, Wales.

Divider image

Lighting up an historic landmark building, Thornbury Castle

Design and Specification | Leisure

Electrio was recently selected to work as the main electrical subcontractor on a multi-million pound renovation project for Thornbury Castle.

Divider image

Transforming an old surgical ward into a sophisticated ICU for COVID patients

Design and Specification | Healthcare

During the first wave of COVID 19 Electrio was asked to assist in a group project to transform an old surgical ward at RUH into a sophisticated ICU for COVID patients.  

Divider image

Installing new IPS/UPS units to upgrade theatres at University Hospital Bristol

Installation and Maintenance | Healthcare

Early in 2021 we began a rolling project as part of the Group 2 improvement plan to 24 theatre units and 6 recovery areas at the University Hospital Bristol NHS Trust.

Divider image

Bristol Royal Infirmary

LED Lighting | Healthcare

Electrio worked closely with specialist lighting and D&B Facades to install LED lighting along a new facade being installed as part of a £3.5million upgrade to improve the exterior of Bristol's BRI Hospital.

Divider image

Milsom Place Bath

Installation and Maintenance | Retail

Returning to this fashionable, busy shopping centre in the heart of Bath to conduct necessary maintenance and an Electrical Condition report.

Divider image

Dairy Crest Waste Water Treatment Works

Installation and Maintenance | Food and Beverage

Working closely with site engineers from Dairy Crest, Electrio replaced a 40 year old Blower House Switchboard for a new one at their busy waste water treatment plant in Davidstow.

Divider image

UBHT Bristol Eye Hospital

Design and Specification | Healthcare

Electrio was awarded the contract to upgrade the existing 3200amps Dual Supply Changeover Panel, including a new Low Voltage supplies for the Audio Visual transformer and replace the main Low Voltage panel within the Eye Hospital.

Divider image

Victoria Methodist Church

LED Lighting | Commercial

The refurbishment of Victoria Church was an exciting project to take on, our brief was to illuminate the Sanctuary and Narthex with the reference to the alter, Rose Window and organ.

Divider image

St Michael’s Hospital

Design and Specification | Healthcare

Electrio was tasked with designing and installing a new switching panel at a busy maternity hospital, and continuing to provide power throughout the installation.

Divider image

BRI Hospital Central Sterile Services Department

LED Lighting | Healthcare

Electrio rewired and updated the lighting systems within the central sterile services department (CSSD) in a major hospital, with minimum disruption.

Clarks Shoe Distribution unit

LED Lighting | Warehouse

Electrio worked in partnership with Phillips Lighting to provide a Turnkey project to replace the existing T5 fittings within their distribution depot in Glastonbury.

Weston General Hospital

Design and Specification | Healthcare

Electrio won the contract to deliver an UPS/IPs system to CICU /ITU and recovery at Weston General Hospital.

Divider image

Portishead Police headquarters

Installation and Maintenance | Emergency

With careful planning and design, Electrio's skilled electrical engineers replaced the permanent generators at Portishead Police headquarters.

“I have been asked to pass on the thanks of our CEO for your valuable assistance during the power supply problems of Sunday evening and Monday morning. Please extend this to all members of your team who were involved in the works. ”

Hospital Engineer, Royal United Hospitals, Bath

“Thank you for your help in being able to complete on time a very difficult project. This was a lot of work condensed into two weeks and without your help could not have been achieved, please pass our gratitude onto all your operatives who took part.”

Operations Manager, MIDAS property services

“Clarks Distribution Centre, this job was a great team effort and I am grateful to your Guys for being practical and flexible in what can be a difficult environment. We will be keeping your details on record for future reference and thanks again for all your hard work in bring the LED project to a successful completion ”

Group head of facilities Management - Clarks

accreditation-chas icon
accreditation-dbs icon
accreditation-pasma icon
accreditation-ssip icon
accreditations-niceic icon
accreditations-eca icon
accreditations-safe-contractor icon