We have been helping a wide range of businesses in Bristol and across the south west with their electrical solutions for almost 30 years. Our case studies show just a few examples of projects we have worked on.
Dairy Crest Waste Water Treatment Works
Installation | Maintenance | Food and Beverage
Working closely with site engineers from Dairy Crest, Electrio replaced a 40 year old Blower House Switchboard for a new one at their busy waste water treatment plant in Davidstow.
UBHT Bristol Eye Hospital
Design | Healthcare
Electrio was awarded the contract to upgrade the existing 3200amps Dual Supply Changeover Panel, including a new Low Voltage supplies for the Audio Visual transformer and replace the main Low Voltage panel within the Eye Hospital.
Victoria Methodist Church
LED Lighting | Commercial
The refurbishment of Victoria Church was an exciting project to take on, our brief was to illuminate the Sanctuary and Narthex with the reference to the alter, Rose Window and organ.
St Michael’s Hospital
Design | Healthcare
Electrio was tasked with designing and installing a new switching panel at a busy maternity hospital, and continuing to provide power throughout the installation.
BRI Hospital Central Sterile Services Department
LED Lighting | Healthcare
Electrio rewired and updated the lighting systems within the central sterile services department (CSSD) in a major hospital, with minimum disruption.
Clarks Shoe Distribution unit
LED Lighting | Warehouse
Electrio worked in partnership with Phillips Lighting to provide a Turnkey project to replace the existing T5 fittings within their distribution depot in Glastonbury.
Weston General Hospital
Design | Healthcare
Electrio won the contract to deliver an UPS/IPs system to CICU /ITU and recovery at Weston General Hospital.
Portishead Police headquarters
Installation | Maintenance | Emergency
With careful planning and design, Electrio's skilled electrical engineers replaced the permanent generators at Portishead Police headquarters.